Northern Sydney Freight Corridor Stage 2

Infrastructure Australia | Infrastructure Priority List |

Northern Sydney Freight Corridor Stage 2

icon stage 1
icon stage 1 red
EARLY STAGE PROPOSAL
icon stage 2
icon stage 2 red
POTENTIAL INVESTMENT OPTIONS
icon stage 3
icon stage 3 red
INVESTMENT READY PROPOSAL
icon stage
icon stage red
PROJECT DELIVERY
icon stage 4
icon stage 4 red
POST COMPLETION REVIEW

Northern Sydney Freight Corridor Stage 2

A graphic of the Australian continent with NSW state shaded and small dot representing Sydney.
LOCATION
Sydney, NSW
GEOGRAPHY
Fast-growing cities
SECTOR
Transport
OUTCOME CATEGORY
National Connectivity
PROPONENT
NSW Government
PROBLEM TIMEFRAME
Medium term (5-10 years)
DATE ADDED
17 February 2016
Problem

Demand for rail freight in the Newcastle to Sydney corridor, using the Main North Rail Line, is projected to continue growing over the coming decades.

Stage 1 improvements to the Northern Sydney Freight Corridor have increased the corridor’s capacity by 50%, from 29 to 44 freight trains each day. This will accommodate growth in demand for rail freight up until 2028. In the longer term, the Sydney metropolitan rail network will again become a point of bottleneck for the rail freight network, mainly because of priority given to passenger rail services.

Potential investment options

A second package of infrastructure improvements in the corridor would build on the earlier package to deliver a significant increase to core period (5 am to 10 pm) rail freight capacity, along with improved average transit times for freight services. This would also improve freight and passenger service reliability along the Main North Rail Line between Strathfield in Sydney and Broadmeadow in Newcastle.

The candidate projects for the second package include Rhodes to West Ryde quadruplication and additional track capacity between Thornleigh and Hornsby (known as the Thornleigh to Hornsby Third Track project).

The NSW Government has completed a preliminary design for Rhodes to West Ryde quadruplication and Thornleigh to Hornsby Third Track. The scoping and timing of this work is currently being developed in conjunction with a response to the Sydney rail network capacity proposal, which is separately listed on the Infrastructure Priority List.

Next Steps

Proponent to complete business case development (Stage 3 of Infrastructure Australia’s Assessment Framework).

 

Refer to Infrastructure Glossary for terms and definitions.